Battery energy storage selection
LG Energy Solution BESS planning
LG Energy Solution organizes an initial BESS conversation around dispatch duration, power demand, electrical interfaces, and the documents a project team needs to review.
Review storage options
Application matrix
Compare storage roles without a long catalog preface.
Commercial peak managementConsider demand profile, PCS coordination, and site operating hours.View catalog
Backup resilienceMap critical loads, transfer logic, and expected autonomy before sizing.Start a brief
Grid-connected storageBring interconnection, EMS, and dispatch constraints into the selection record.See support
Project casesApplication context first
Warranty processDocumented review route
Test recordsRequest applicable evidence
Support deskScope the next question
Evidence path
Make the review package visible before procurement.
Certification
Identify UL 9540 and UL 1973 applicability for the planned stationary-storage system.
Transport evidence
Plan the UN 38.3 documentation questions required for the relevant battery shipment.
Datasheet review
Use product documentation to verify interfaces and rating assumptions with the project team.
Find a project route
Bring location, application, and intended operating outcome to the first conversation.
Contact project supportBuild a selection brief
Use the compact configurator to organize the questions that influence BESS fit.
Open configurator